Recent Changes

Friday, February 14

  1. page La Casa de Figueroa edited RK - Kitchen Kaylee Weires= I made some part of the living room, which was the tv, table, icebox,…
    RK - KitchenKaylee Weires= I made some part of the living room, which was the tv, table, icebox, and the girls room. And then I decorated the girls room and also some part of the living room. I made the Tiles in the girls room, and also I made the bathtub and the curtain for it. I made the light go on in the garage. And thats all I did.
    Reyna San Juan
    Maria Molina
    Rk Kalus
    Irochy Enriquez

    (view changes)

Friday, February 7

  1. page Soccerfield edited ... Stands Noah parking lote stands I dont know anymore jobs plz tell me some. {Photo on 1-…
    ...
    Stands
    Noah
    parking lotestands
    I dont know anymore jobs plz tell me some.
    {Photo on 1-21-14 at 9.24 AM.jpg}
    (view changes)

Friday, January 31

  1. page Sporting Goods Store edited ... The opening in the front will be closed eventually but we are leaving it open to make it easie…
    ...
    The opening in the front will be closed eventually but we are leaving it open to make it easier to work. The layout is drawn out on the floor. Start designing the circuit for your area. Also, the door is going to be automastic with a switch where you walk in. Maybe try to design a circuit for that too.
    {Photo on 1-21-14 at 11.12 AM.jpg} This is what i have done
    \
    The floor is painted and is in place. We aren't glueing it in, because we are going to wire under it. We built 2 clothes racks, and today we are just trying to put everything together so that we can start wiring on Friday. Hot glue the dressing rooms into place where they are and the stools inside them also. Start putting clothes on hangers and the hangers on the clothes rack. Fill this out.
    That day I painted the floor green, and glued it in.
    {WhitePaint.jpg}
    I started to work on my part of the store, I glued shelves on and put baseballs, basketballs, and soccer balls.
    {Photo on 1-27-14 at 3.09 PM.jpg}

    Name/Area
    Person Responsible
    ...
    {Photo on 1-28-14 at 10.46 AM #3.jpg}
    This is all i have and its all completed so waiting for you guys to finish.
    My circuit and light {Photo on 1-27-14 at 12.08 PM.jpg}
    {Photo on 1-27-14 at 12.10 PM.jpg} I'm finished

    (view changes)
    1:05 pm
  2. page airport edited ... Well guys I got the runway done and it is my spot and I put black paper on it. {Photo on 1-21-…
    ...
    Well guys I got the runway done and it is my spot and I put black paper on it. {Photo on 1-21-14 at 9.26 AM.jpg} And I am Kaden.
    {Photo on 1-21-14 at 9.28 AM.jpg} {Photo on 1-21-14 at 9.27 AM.jpg}
    ...
    all my electicalelectrical work so
    ...
    finish yours. -gaige wilson-Gaige Wilson
    Today I got my top roof lights to work and Im starting to do the TVs and other things. -Gaige Wilson
    Kaden Miller:Runway
    (view changes)
    7:10 am
  3. page Hotel edited Go here http://www.youtube.com/watch?v=hRGKNOYRV80&feature=youtu.be http://www.youtube.com…

    Go here
    http://www.youtube.com/watch?v=hRGKNOYRV80&feature=youtu.be
    http://www.youtube.com/watch?v=RME5B9AgoBw&feature=youtu.be
    http://www.youtube.com/watch?v=713HgkcEkiI&feature=youtu.be
    Room/Area
    Room/Area
    Person Responsible
    Number of lights needed
    (view changes)

Thursday, January 30

  1. page School edited ... Painted the Gym and 3 rooms on the top floor. Created a window at the side of the building le…
    ...
    Painted the Gym and 3 rooms on the top floor.
    Created a window at the side of the building leading to S.S. room.
    Made table and chairs.
    Put lights in the reading/writing, Office, and S.S room.
    Made switches and finished wiring the rooms.

    Room/Area
    Person Responsible
    (view changes)
  2. page School edited ... 1 1-2 Cafe Sabrina Q 4 2 1 Library Sabrina Q 2 0 1 1 {Photo on 1-23-14 at 9.51 …
    ...
    1
    1-2
    Cafe
    Sabrina Q
    4
    2
    1
    Library
    Sabrina Q
    2
    0
    1
    1

    {Photo on 1-23-14 at 9.51 AM.jpg}

    (view changes)

Wednesday, January 29

  1. page White House edited ... DJ- I'll do the front entrance. Khalik- I'll do the Bowling Alley ... the Truman Blacon …
    ...
    DJ- I'll do the front entrance.
    Khalik- I'll do the Bowling Alley
    ...
    the Truman BlaconBalcony
    Megan- i'll do the east bedroom (maybe the west bedroom)
    Dylan- both wings need to be fixed
    (view changes)
    3:28 pm
  2. page Book Store edited ... Paulina did the mystery room and hooked up most of the circuits. Amanda did the lobby and non…
    ...
    Paulina did the mystery room and hooked up most of the circuits.
    Amanda did the lobby and non-fiction room.
    {Screen Shot 2014-01-29 at 1.10.33 PM.png} This is the wiring connected to the battery after we had set up all of our lights together, It was a bit difficult due to all the wires used. But we managed to get it to work. :)
    (view changes)